Telecoms Civils and External Network Contractors
Duct routes, chambers, trenching, PIA works, blockage repair and reinstatement for network operators and main contractors, delivered by our own civils teams from Ormskirk.

Civils and external networks
Every fibre network starts in the ground. Core Group Infrastructure delivers the civils for full fibre and telecoms programmes: new duct routes, chamber and footway box installation, trenching across verges, footways and carriageways, and the reinstatement that closes the job out.
We also work within existing infrastructure, carrying out PIA (Physical Infrastructure Access) works on Openreach duct and pole networks and clearing blockages so that cable can be pulled or blown through. Because the same company carries out the civils, the cabling and the splicing, the route is built with the installation that follows in mind.
- Duct routes and chambers
- Trenching and excavation
- PIA and blockage repair
- Reinstatement
- Delivered with direct labour from Ormskirk
Scope of works
Duct routes and chambers
New duct runs laid to depth with warning tape and draw ropes, and chambers and footway boxes set to level in verge, footway and block paving.
Trenching and excavation
Open cut trenching, narrow trenching and hand dig around existing utilities, with traffic management and site protection in place for the duration.
PIA and blockage repair
Works on Openreach infrastructure under PIA, including locating and excavating blocked or collapsed duct, repairing it and proving the route clear.
Reinstatement
Footway, carriageway, block paving and soft verge reinstatement to the Specification for the Reinstatement of Openings in Highways, recorded and photographed.
Recent work






Frequently asked questions
What civils work do you carry out for fibre networks?
New duct routes, chamber and footway box installation, trenching and excavation, PIA works on existing infrastructure, blockage repair and permanent reinstatement. The civils can be let as a standalone package or as part of a full build that includes cabling, splicing and testing.
Do you work on Openreach infrastructure under PIA?
Yes. PIA works, including blockage clearance and duct repair on existing routes, are part of our civils scope for network operators building on Openreach duct and poles.
Who arranges street works notices and permits?
Notices and permits are raised with the relevant highway authority before work starts, with traffic management agreed to suit the location. The arrangement is confirmed with the client at the start of each programme.
How do you handle reinstatement?
Reinstatement is carried out to the Specification for the Reinstatement of Openings in Highways, matching the existing surface, whether that is asphalt footway, carriageway, block paving or verge. Each reinstatement is photographed for the record.
Can you take on the civils and the fibre installation together?
Yes. We are a single main contractor for every element of a connectivity project, so the duct, the chambers, the cable, the splicing and the testing can all be delivered by our own teams under one contract.
Related services
Areas we cover
Based in Ormskirk, we work across the North West and UK-wide for network operators, ISPs and main contractors.
Planning a civils programme?
Discuss scope, coverage and timescales with our team in Ormskirk.
Discuss your project with our team
Send us the scheme, location and programme and a member of our team will be in touch. We work with ISPs, network operators and main contractors across the UK.